It looks like 8 on each ship. I'm not sure how many hulls.How many Anzacs have NSM fitted now? 3 or 4?
I wouldn't trust Johnston to tie his shoe laces.I didn't know our national shipbuilding strategy had so much commonality with Victoria's big build, ie talk about continuity but with a focus to line the pockets of your Union mates and secure their long term relevance (and resulting donations) in a bloated and slow infrastructure build. It's more about padding than the actual output.
I digress but on a mental note, if Dutton does build a state owned nuclear reactor, we need to be very careful about who is tasked to build it if he wants it on time and budget. My mind goes to Snowy 2.0 meets Hinkley Point C ...
And to think David Johnson thought he couldn't trust ASC to build a canoe ...
Yes I got off topic but these delays are unacceptable and the ANAO should be lighting a fire under it.
Including the d/PM by the sounds of it.I wouldn't trust Johnston to tie his shoe laces.
An election coming so Murdoch sticks the boot into Australian industry, what a suprise.
BAE staff have just gone out on strike, it appears their wages are 20% below current market rates, and they've only been offered 12% over three years. That sure doesn't sound like the unions have been rorting etc. it actually sounds like they have let their members down.
Lots of speculation around at the moment, about the only facts I've seen recently are, the RAN has six Collins class boats, they were built by ASC, designed by Kockums and they are getting a life extension. Pretty much everything else is people who don't know guessing.
I've worked in engineering on major projects for decades, our pay is, if not below what we were paid a decade or decade and a half ago, well below CPI. In the same time financial sector and non technical PMs salaries have gone through the roof, literally doubled in some cases.Including the d/PM by the sounds of it.
I'm not anti union but tired of bloated contracts. I saw the AMWU press release about the 30% increase request over 3 years with only 15% offered. As for whether they are underpaid or overpaid etc, it all depends upon scarcity. I just don't want to see the bill going up in similar fashion.
The Allen govt was asked how they could afford paying nurses some 30% more over 3 years (or similar) to which the new Premier replied "the usual way". She meant debt borrowing but didn't have the guts to say it.
Public monies should always be utilised like they're your own, and to quote someone, you ego can't keep writing cheques you body can't cash.
As for Johnson, he was widely criticised due to his language but he did have a point.
2 are currently fitted with NSM, 2 more in the process of being kitted out right now. 2 more should have them fitted by the end of the year.It looks like 8 on each ship. I'm not sure how many hulls.
And two will never have NSM grace their decks2 are currently fitted with NSM, 2 more in the process of being kitted out right now. 2 more should have them fitted by the end of the year.
Sure there is, accelerate Hunter and order GPF ASAP.Surface Fleet down to 2 Hobarts and 6 Anzacs by the end of 2026, surely we can do something to increase the size between now and 2035?
2026> 2 Hobart, 6 Anzac = 8 ships
2029> 3 Hobart, 1 GPF, 5 Anzac = 8 ships
2032> 3 Hobart, 3 GPF, 2 Anzac = 8 ships
2035> 3 Hobart, 4 GPF, 1 Hunter, 0 Anzacs = 8 ships
https://www.defence.gov.au/defence-activities/projects/hunter-class-frigateSurface Fleet down to 2 Hobarts and 6 Anzacs by the end of 2026, surely we can do something to increase the size between now and 2035?
2026> 2 Hobart, 6 Anzac = 8 ships
2029> 3 Hobart, 1 GPF, 5 Anzac = 8 ships
2032> 3 Hobart, 3 GPF, 2 Anzac = 8 ships
2035> 3 Hobart, 4 GPF, 1 Hunter, 0 Anzacs = 8 ships
You cant accelerate the first Hunter build and the GPF selection was always 2025 for 2026 steel cutting. Even if they selected the winner right now, you could not speed up the delivery time.Sure there is, accelerate Hunter and order GPF ASAP.
It all comes down to money and workforce.
1) Hunter class can be accelerated as long as all the long lead items have been ordered, it just requires throwing more equipment and workers at the problem.You cant accelerate the first Hunter build and the GPF selection was always 2025 for 2026 steel cutting. Even if they selected the winner right now, you could not speed up the delivery time.
Mitsubishi begins the build of 2 upgraded Mogamis this year and then 3 in 2026. If they gave us the 1st or 2nd, it would be late 2028 delivery. Ship 3, 4 or 5 2029 delivery. (Articles have stated ship 3 or even 2 could be the 1st delivered to the RAN.) = 1x2028 or 2029, 1x2029 or 2030, 1x2030 or 2031 at the earliest.
TKMS build an A200 in about 2.5-3 years so if steel is cut in mid 2026, the first would be delivered in 2029, the 2nd could be delivered in 2029/2030 and the 3rd in 2030 at the earliest.
The workforce at Osborne has to be built up again, that takes time.1) Hunter class can be accelerated as long as all the long lead items have been ordered, it just requires throwing more equipment and workers at the problem.
2) If the GoD is truly concerned about fleet numbers, they can just order 3-4 each of A200 (ideally configured as close to a current ANZAC as possible) AND upgraded Mogami from overseas and then move the build of whichever is the preferred to either Perth or Adelaide for later units.
If I said that, I'd immediately get "ok boomer".Many managers used to be engineers or even came off the tools, now they are admin people who fall into PM, contracts and administration roles. Think on that.
I wasn't going to say it, but I need to. The kids who weren't good at maths and science, follow an easier, kinder path into device related roles. Because of the low intellectual bar, and the lack of anything actually quantifiable, they are promoted on popularity and likability. They end up as senior managers and directors, decision makers.
That's correct at this stage.And two will never have NSM grace their decks![]()
Thanks Pusser012 are currently fitted with NSM, 2 more in the process of being kitted out right now. 2 more should have them fitted by the end of the year.
Although it’s desirable to have those two Anzacs kept as a “Reserve fleet”, I suspect that HMAS Anzac is being stripped of usable parts to keep the remainder of the fleet going with a similar fate awaiting HMAS Arunta.That's correct at this stage.