Ananda - the unhappiness with DSME, what aspects are they not happy about?
There's a lot of speculations on that, from batteries capabilities not in specs, some equipment, thus I just goes with what officially being stated.
MinDef stated that the First Submarine of three has 12 items need to be rectified, and so far according to them from 12 only 5 still need to be sorted out.
The second submarine they only said already improve significantly, thus I don't know if they still have problem need to rectified or not.
The Third Submarine (the one being assemble in PAL facilities) still being tested by Both PAL and DSME.
This DSME 1400 basically DSME called in their statement as improved Chang Bo Go (original DSME 209) for Indonesian specifications. Thus for First Submarine of this batch basically is the first submarine of new specs which there will be some adjustments need to be done. Even Australia have problem in the beginning on Collins class, thus for me it's should be expected some adjustments needed.
All this 'noise' of some in Navy or MinDef not happy with DSME 1400 perhaps like tonnyc said in his post related on some 'factions' in Navy or MinDef not happy with what specs DSME delivered. Perhaps those are guys that not happy with DSME 1400 being choose in the first place (remember there are still some political factions and their supporters that still want Russians Submarine). However DSME 1400 is the type of Submarine that still within capabilities of local Industry (in here PAL shipyard) to develop. PAL already have some experience overhauling older 209, thus improve 209 like this DSME 1400 is the logical step for them to begin their journey on Submarine Fabrication.
I think what frustrates us - casual/enthusiast observers - is how the defence acquisition, sometimes seems to be cobbled together.
This is basically what my ranting on Indonesian threads with previous defence minister, MinDef and Jokowi's first term administration all about. No coherent long term plan and bad implementation.
Now, they say they will review all defense projects (whether already finish or still on going) and will make them more coherent with long term plan of Indonesian defense development. They also stated, any projects must shown beneficial effects toward domestic defense industry capabilities and technologies development.
In short they are going to review current projects and other potential partnership that can be available to be more beneficial for domestic Industries. Thus if this going to be implemented consistently, then they are looking for more standardise plan procurement with long term effect for local defense industry involvement.
Will see what will come out, since this is already the language that come not only from Prabowo's but also Jokowi's.