124 us the initial order, there was a lot of coverage of this on a program on DD news called WAR and Peace, as the production lines are open, the order has to be followed up till the army gives a good reason, MoD will keep on pestering them, develeping a logistics network for arjun and a training platform etc. etc. will not be justified for 124 tanks,
from the india defense site article: reports-3006
associated equipment includes
Again the DRDO has changed a lot over the last 5 years, i think they will start to work with the army over the next project and completely replace the tanks and associated equipment in the next generation.
from the india defense site article: reports-3006
associated equipment includes
add new new rail cars, trucks etc. to the list.* A bridge layer based on the Arjun chassis has also been displayed by the DRDO. Developed in cooperation with Indian industry, this bridge layer is deemed superior to the T-72 based units, as it can handle a larger load and uses a "scissors type" bridgelaying method, which does not raise the bridge high up into the air, and hence make it visible from afar.
* Armoured engineering vehicles based on the Arjun are also assumed to be in development, as the Arjun induction will require units of a similar power to weight ratio or powerful enough to tow it, or recover it on the battlefield.
Again the DRDO has changed a lot over the last 5 years, i think they will start to work with the army over the next project and completely replace the tanks and associated equipment in the next generation.