I believe (going off memory here, a dangerous prospect at best...) that the US equivalent to the MU90 as a replacement for the Mk 46 was actually the Mk 50 LWT which had design work start circa ~1989. The US ended up deciding to not replace the Mk 46 LWT with the Mk 50, and instead had the Mk 54 developed which was to incorporate improvements to systems found in the earlier LWT's. The Mk 50 had a propulsion system developed to enable engaging Soviet Alfa-class SSN's which had both high top speed and deep diving capabilities. While the Mk 50 propulsion was capable, it was also IIRC quite expensive and IIRC the MU90 has a similarly capable (and expensive) propulsion system. Meanwhile, the Mk 54 was to feature sensor and guidance improvements developed for the Mk 50, with a propulsion system more like that of the Mk 46 which was slower and significantly less expensive. IIRC there had also been some propulsion developments to make the Mk 54 more effective in shallow/littoral waters that the Mk 46 had been.
One of the major issues I have with the ADF having selected the MU90 as the replacement LWT was that as I understand it, the selection was made at least in part on the belief that the MU90 was a developed weapon system, when the reality proved to be rather different. By the time the MU90 was actually ready for frontline service, I believe the threat matrix had changed.