We have our own school also (MAF Defence College) but Generals do get sent to the schools in Pakistan and US.
Edit: Based on MOD handout given at DSA 2008, they are going to 4th Mech, reproduced below:
1. Supply and Delivery of 48 units Armored Carrier Vehicle (ACV) 300 Adnan for the Malaysian Army
Contractor: DRB-Hicom Defence Technologies Sdn. Bhd. (DEFTECH)
Contract Value: RM 425,394,143.89
Delivery: 2008-2010
Quantity:
12 Units Infantry Fighting Vehicle I
8 Units Infantry Fighting Vehicle II
8 Units Infantry Fighting Vehicle III(A)
4 Units Anti-Armour Vehicle
2 Units Armoured Vehicle Signal
4 Units Armoured Vehicle Recovery
10 Units Armoured Vehicle Fitter
Special Features: Radio Fastnet, Spall Liners and Mine Protection Kit
Background:
In 2000, the government of Malaysia signed a contract to procure 211 units of ACV-300 Adnan manufactured by FNSS, Turkey. Out of 211 Units, 134 were manufactured and assembled in Turkey while the balance was assembled in Malaysia by Deftech. By 2004, all these vehicles have been supplied to the Malaysian Army.
The Acquisition of 48 units of ACV-300 Adnan is the continuation of the above project to fulfill the requirement of the Mechanized Brigade. The new ACV-300 Adnan can perform both conventional and peacekeeping operations.
Implementation Schedule:
The effective date of the contract is upon the signing of the Letter of Acceptance by the Seller
The Delivery schedule for the ACV-300 Adnan is 20 months from the date of the signing of the contract and the last delivery will be 32 months.
2. Supply and Delivery of 8 units ACV-S 300 Adnan Mortar Carrier for Malaysian Army
Contractor: DRB-Hicom Defence Technologies Sdn. Bhd.
Contract Value: RM 52,560,000.00
Type of Contract: Direct Negotiation
Delivery: As Per Required by Government, before 31st December 2009
Note: To carry TDA Armements SA 2R2M 120mm Mortar.