TNI-AL official channel provide video on one of DSME 1400 (209 Derivatives). This is first time on my knowledge that TNI-AL make video dedicated to shown operational of one of their Submarine. Previously they only shown glimpse of interior.
Still not clear if Indonesia still want to continue the program for DSME 1400 second batch, or only move with to build license production with Naval Group on Scorpene NG. The strategy to fasten submarine build up so far that already being talk by MinDef sources:
- Underlicense Production (Scorpene NG),
- Continue Industrial Collaboration (other word on Final assembly with some modules done by overseas yard) with DSME (Hanwha Ocean) for 209-1400 batch 2,
- Procure Second Hand Submarine as interim ones,
- Procure Full Import submarine from overseas yard.
The first one is confirm ongoing project, the second one is not clear continuation of batch 2. At this moment all 3 batch 1 209-1400 being upgrade by PAL and Hanwha Ocean to rectifies the electrical problems and battery problems. Thus 2nd strategy seems will depend on the batch 1 retrofitting project result.
The 3rd and 4th ones being talk, but still under speculation. Potentially the 4th one will not be taken, but 3rd ones has more noises and rumours going to be decided soon. But thing can changes if Indonesia MinDef decide not going to continue batch 2 with Hanwha Ocean. It is possible even the number of Midget Submarine project with Italian DRASS can be increase to augment 209-1400 as litoral submarine project. In short asside #1 of Scorpene License Building, all other strategy still fluid.