Local enthusiats tweet call #tweetmiliter put this short video on what supposedly PAL iteration of Babcock Arrowhead 140. I'm quite shock with the design as it is quite alteration from Arrowhead design. Especialy as they are lengthening the bow quite much. I'm just wondering if this is the design that Babcock already agree on.
There're rumours that the reason why first steel cut still not commencing as Babcock has not agree with the PAL alteration. This PAL model is 143m+ thus 5 meter longer then type 31. Rumours call Babcock only agree to lengthen the design by less then 2 meter toward 140m.
I do hope they are listening to Babcock, afterall that's what the license agreement are. If somehow Babcock already agree on this design, then it means Babcock going to ask some more adjustment in the overall specs. It is practically like doing new design.
The video shown the conversation that seems shown doubt about the design. As this is demanded on someone high which can be change, if there are political changes. Shown how Indonesian defense items planning really drive by politics not real technical defense calculations.
The model shown what supposedly VL MICA type VLS in Bow, and Sylver type VLS in the middle. Seems the insistance to put as much as possible VL MICA type VLS in the Bow section that drive this 5 m lengthening.
I do hope Babcock can put senses on this.