What we also need to keep in mind, is what do the RNZAF actually want and what can they make full use of.
The FASC operational concept, reads the RFI, “will be largely a continuation of the extant P-3K2 Orion based concept, adapted to exploit any greater platform and capability systems performance of the FASC fleet and support systems.”
While mutual concert with the ADF is very desirable. The number one requirement will be to satisfy New Zealand's needs and requirements first. The business case style that is used in procurement would have to show significant benefits to us for extra funding to be granted in this area. If a capability enabler with the ADF is show to be of a similar cost benefit as a straight capability replacement, then obviously it would be chosen, If however it is not, it may not be.