For a new platform to make the short list it'll have to be in far more use that just a handful of operators that have relatively small operational fleets. It'd also have to be widely in use with operators that we frequently work with & have a proven support / spares network. That's not to say the C2 won't prove itself & be in wide service eventually, but that won't happen within a timeframe that satisfies the NZDF.Valid point - However the RNZAF won't be replacing the Hercules until after 2020 correct? By which point it should have been operating with the JSDF for at least a couple of years.
If it works as designed, it has significant capability advantages over the A400 and C-130J, given that the C17 option has virtually sailed - it should at least be looked at.