Correct but what doctrine will we use for Bushmaster mounted? CAV? a mixture of both or try a mash together of everything to come up with our own version again. TRADOC has not been tasked to develop a future concept of ops for Bushmaster type replacement & the two battle lab with both 1R & 2/1 are solely involved in light Ops testing & validating equipment currently for that role only I just don't see a Pinz replacement on the horizon in the short or medium term. Im not saying its not going to happen it will but not in the next 10 to 15 years.CD, your comment that only the SAS know what they are getting is not correct. The SOV replacement is currently one of the individual projects contained within the Land Transport Capability Program (LTCP) that CAP Br are running (MHOV being another). As with all NZDF/MoD projects the customers (i.e. SAS & COMLOG for the SOV) will have a set of requirements that the Project team will develop into a RFT then downselected via a BC then a finally a Acquisition Contract to purchase a capability that will be Intoduced into Service.
I have yet to see the specials not get what they want hence the 11m RHIBs to replace there well used but tired 6m RHIBs, everything they do is & as it should be Operational 24/7.Unless there is a Urgent Operational Requirement all Projects follow this process, even for the "specials"
I know there is but my point goes back to the user requirement has Army even begun the process of an replacement? IMO the MLU for NZLAV is the next big ticket item on the horizon & I know that's being worked on now. 10 - 15 years is my best bet before we even start to look at developing the Doctrine, UR etc for the replacement LOV & that will be another big job for Cap Branch, TRADOC, Battle Labs, Units & the other two services you name it.I can assure you that there is plenty of money in the LTCP funding line of the Defence Capital Plan to allow for the purchase of a LOV replacement, but it is way to early in the process to be talking about what specific makes/models (Bushmaster or something else) will meet the LOV user requirement.
Last but not least the days of Army purchasing equipment for its sole use are long gone buying equipment for Army is no longer a single service decision anymore it will affect all three services some way or another ie the JATF.
CD