John Newman
The Bunker Group
Again I agree, the RAN is in the "poo" and needs the Largs Bay in service ASAP as is, I get that 100% no argument.Nothing I've seen shows a retrofit.
Largs is being considered (and its still subject to a deeper materiel examination and basic trials) because there is a capability gap of some urgency
to attack her superstructure with significant structural changes would delay her for some time, I'd estimate another 2 yrs, and as she is arriving (subject to successful final review and trials) I cannot see anyone pulling her offline for another 2 years to make mods that are outside of her employment intent. This also ignores the reality of how long it would take to get an approved and accepted engineering solution approved - let alone actioned
To put her into maintenance for another 2 yrs would make a nonsense of the urgent intent to get her in the first place.
Canterbury will not cover off the capability - and she is only designed to supplement any deficiencies generated by Tobruks potential withdrawal
Forget about major changes. The planning and implementation realities suggest not.
All I keep asking is, because I have seen reference to it, in both print and online, that in the original design a hangar was a "possible retrofit" if required.
I'm not saying it does or doesn't need a hangar, all I want to know if that it is true.
I'm sure the only modifications the RAN will do to Largs Bay is change anything that is "necessary" to put her into service, again, agree 100%
Somewhere down the track, and that will be well after the LHD's are in service, there probably would be consideration for major changes, inconjunction with a major refit / modernisation.
And again, that's is something the navy will work out for themselves in the years ahead.