I im not sure either move them to ASW vessels which i still see as alright idea and just fit point defense missiles (Mistral) or like other SM-1 users upgrade it to fire SM-2 so it has some utility. Or see if their are any buyers for a quite young shipThen I guess the F70 A/A should receive a mid-life update. What do you think would be the most cost effective way to improve them?
And what about the La Fayette? They are now "1st rank" frigates, but still armed like corvettes.
Would that be for SM-2 because im sure its somewhere on the thread the updates I forgot completely about it.IIRC the F70 AA were scheduled to get an update, but it was cancelled for financial reasons.
Yes I think none of the mid-life updates are happening.IIRC the F70 AA were scheduled to get an update, but it was cancelled for financial reasons.
MN is likely to but some GoWind for that purposeThe patrol role is something that really needs replacement in some way, maybe a class of OPVs similar to the Floreal or even some cheaper corvettes with limited ASW/AAW capabilities - money talks there realistically.
Let's hope MN can find some money to upgrade to Simbad RC & Tetral.The CDG has 2 Sadral launchers. The Marine Nationale needs to put some sadrals on the 4 sadrals each on the Mistrals.
Zoom in just behind the rafale.
http://upload.wikimedia.org/wikipedia/commons/a/a7/Panorama_Charles_de_Gaulle.jpg
Why 2 LHD? One is already building to replace Foudre. Siroco can easily run on into the 2020s.This is a list of vessels that must be ordered from 2011 to 2022 to replace existing vessels.
2 AAW frigates
9 ASW frigates
6 SSN
4 AOR
2 LHD
18 OPV of the BATISMAR program ( to replace the P400, BATRAL, and A69s )
7-9 new minesweepers
And many more smaller programs that will add up.
Yes, one LHD will enter service next year. And all the frigates have been ordered, and one is on sea trails. I miss spoke, but they are tying up the procurement budget. Also the first three Triomphant class submarines will getting a new combat system (SYCOBS) and new modernized sonar suites along there upgrades to carry M51. The MN was right to cancel the third and foruth horizons due to budget constraints.Why 2 LHD? One is already building to replace Foudre. Siroco can easily run on into the 2020s.
And 11 frigates? I thought the aim was to have 18 frigates including the Horizons & Lafayettes, which means 11 new ships in total - but one of those 11 is on sea trials, & more are already building, so don't need to be ordered.
But wont the AAW FREMM's cost almost as much as a pair of Horizons anyway by the time any additional development work has been completed anyway?The MN was right to cancel the third and foruth horizons due to budget constraints.
I'd be surprised if they were much less.But wont the AAW FREMM's cost almost as much as a pair of Horizons anyway by the time any additional development work has been completed anyway?
They will be close to the price of Horizons. When the Marine Nationale, canceled the LA FREMM the cost of the series skyrocketed. The FREDA priced has increased because of that mistake by the MN. They should've ordered the LA FREMM, and upgraded them with ASW systems in the future. None the price has jumped 7.8b euros for 11 ships; instead, of 6.5b euros for 17 ships. The MN has to replace the FOST, FREMM stationed at Brest with ASW OPV. Five FREMm will be stationed at Brest. What leaves four FREMM for the carrier and amph groups.I'd be surprised if they were much less.