The real problem is now with the mating of the power plant and the hull. The hull to be fabricated of special steel.
As for the missile , Sagarika is the naval version of Prithvi, but its cumbersome compared to the Brahmos, Brahmos is sleek and can be easily fitted into the Sub, whereas Sagarika is facing problem , during the previous tests it has topped more than twice during tests
Rahul Bedi in a news article in IndiaPRWire, dated 17 May 2007, stated the following;
• The vessel will be based on the Charlie I Class boat and will be 124 meters long, have a displacement of 4000 tons and be fitted with a 100 MW nuclear reactor, developed jointly by DAE (Department of Atomic Energy) and DRDO (Defence Research & Development Organisation). Bharat Rakshak Note: Earlier reports indicated that the boat could likely resemble the Russian Navy's new Severodvinsk Class attack submarine and/or the Akula Class attack submarine, of which the Indian Navy reportedly plans to lease a pair.
• The 100 MW nuclear reactor went critical in October 2004 at Kalpakkam and is now fully operational. A miniaturised version of the reactor is under construction for integration into the ATV at Visakhapatnam.
In July 2006, then-incumbent Defence Minister Pranab Mukherjee inspected the ATV's reactor project while participating in the 20th anniversary celebrations of the commissioning of the Fast Breeder Test Reactor at the Indira Gandhi Centre for Atomic Research in Kalpakkam. Earlier, in October 2004, Prime Minister Manmohan Singh visited the ATV facility when he launched the construction of the Prototype Fast Breeder Reactor. The Prototype Testing Centre at Kalpakkam will be used to test the boat's turbines & propellers while a similar facility at Visakhapatnam will run trials on the vessel's main turbines & gearbox.
• Officials familiar with the ATV project stated that the highly enriched uranium fuel for the reactor was supplied by the Rare Materials Project (RMP) in Ratnahalli near Mysore, Karnataka. The four to five years delay in the reactor reaching criticality, was due to the extended time taken by RMP to produce an adequate quantity of uranium, the officials added.
While many components of the reactor like the steam-generator and the control rod mechanism have been indigenously developed within India itself, senior naval officers stated that Russia had helped Indian scientists overcome certain technical hurdles. This included assistance not only in designing the vessel's reactor, but also guidelines in eventually mating it with the boat's hull. The involvement of Larsen & Toubro, that began in 2001, helped kick-start the stalled ATV project. L&T was awarded the contract to build the hull (code named P 4102) at its Hazira dockyard facility in Gujarat and has already floated sections of it on a barge to Visakhapatnam.