I wonder why they didn't set up a second production line for the Ka-52 earlier. The Arsenev plant can barely produce the numbers required (capacity is to be increased to 24 per year), so if this had happened earlier, the MoD could have cancelled the Mi-28N altogether and wait for the Mi-28NM.
Are the official reasons known for which the Mi-28N has been ordered? As far as I remember there have been problems with the type from the beginning.
Well originally the Mi-28 was selected over the Ka-52. Then the Ka-52 got a small order to be a SpetzNaz support helo. Then it got an AVMF contract, and finally a large contract to serve alongside the Mi-28N. Why, I'm not sure.
A few things to consider, the Ka-52 has much lighter armor then the Mi-28N (iirc the Ka-52 is only designed to withstand 20mm impacts, while the Mi-28 is armored to take 30mm). It's max takeoff weight includes 3100 kg of payload while the Mi-28N can carry 3900 kg. Originally it looked like the mast-mounted radar would be ready in time, and the disadvantages of the Mi-28N were consequently not big enough to offset the lobbying power of the manufacturer.
Also, we have some details on the new Tu-214K aircraft. Apparently it's an airborne command post with tactical applications. In other words it's meant to loiter directly above the battlefield, and it will be equipped with photographic equipment, as well as multiple data links. We should expect to see the first aircraft late ~2015.
This is interesting, because the aiborne command posts are also planned on the Il-476, much like the current ones on the Il-76 (the Il-82). Those, however, seem to be pure C4I systems, while the Tu-214K will combined reconnaissance capabilities. Of course practical use of such an aircraft would mean that there can't be any major SAM or fighter threats, which would significantly limit it's application.
ОÐО «Туполев» - У Минобороны поÑвитÑÑ Ð½Ð¾Ð²Ñ‹Ð¹ летающий командный пункт
EDIT: Apparently a contract for 3 more An-140s is in the works right now, at 650 mln roubles each. This is on top of the 11 already bought, and in direct contradiction to earlier statements that the An-140s will not be bought, due to problems with the aircraft's design. They're also buying 7 AW-139s, probably the ones locally assembled in Russia. There are also precontract negotiations for one An-148, and an unspecified number of Be-200, probably in some specialized configuration (given that the price is much higher then the MChS's generic fire-fighting ones). Also the training complex for the Ka-52K will be delivered this year.
http://bmpd.livejournal.com/442486.html