albeit a very commercially certified and operated duck
.... a "battleduck"
albeit a very commercially certified and operated duck
Spain has one LHD - & two LPDs - & until the recent early withdrawal without the previously planned replacement of Principe de Asturias, also had a light aircraft carrier. Their combined tonnage & number of aircraft & vehicles which could be carried were more than the two RAN LHDs. If they'd been prepared to cram 'em in tightly, they could have carried more troops. The choice not to wasn't from lack of soldiers: Spain has far more than Australia (also far more tanks, AFVs, artillery . . . ). The Spanish marine corps alone has enough men to fill the ships, but they're also equipped to carry army units with equipment the marines lack.The Cantabria was designed with 1 LHD in mind. Spain doesn't ever consider the possibility of deploying two heavily loaded (~400 more on each than they plan for) LHD's landing over 2200+ personnel + equipment. That is outside the capability of the Spanish defense forces.
Spain has one LHD - & two LPDs - & until the recent early withdrawal without the previously planned replacement of Principe de Asturias, also had a light aircraft carrier. Their combined tonnage & number of aircraft & vehicles which could be carried were more than the two RAN LHDs. If they'd been prepared to cram 'em in tightly, they could have carried more troops. The choice not to wasn't from lack of soldiers: Spain has far more than Australia (also far more tanks, AFVs, artillery . . . ). The Spanish marine corps alone has enough men to fill the ships, but they're also equipped to carry army units with equipment the marines lack.
BTW, Cantabria isn't the only Spanish navy replenishment ship. Two in service now, & two before Cantabria was commissioned. They were intended to support PdA as well as the amphibs.
Spain has one LHD - & two LPDs - & until the recent early withdrawal without the previously planned replacement of Principe de Asturias, also had a light aircraft carrier. Their combined tonnage & number of aircraft & vehicles which could be carried were more than the two RAN LHDs.
BTW, Cantabria isn't the only Spanish navy replenishment ship. Two in service now, & two before Cantabria was commissioned. They were intended to support PdA as well as the amphibs.
Probably politically impossible to build the submarine in Wa, just wonder how much is it to upgrade ASC for those cold rolling and automatic welding gears?
Cookies must be enabled. | The Australian
Purcell added that for SEA 1180, there were a host of off-the-shelf designs that could potentially satisfy the new helicopter-capable OPV requirement: “We’ve stopped talking about corvettes – the real requirement is for a vessel that can undertake those extended deep sea voyages to offshore territories that we’ve been using the Armidales for.
“We’ll replace them first and then look at what will be most suitable to replace the existing special purpose vessels undertaking hydrography and minehunting.”
II actually fail to see the advantage. Provided fuelling connections are comparable (as they are) then the Navantia product has not advantage as there are few similarities in construction (except for the fact they are all steel the framing. steel type, subdivision, hull form and fact one ship type is a tanker make these very different ships)...... the LHD and AWD are completely different ships to the AOR in both construction and propulsion. Others systems are customer specified.
It will come down to capability and price an the Aegir is not to be written down lightly as it can be delivered very quickly.
How can those Seasprite helicopters that we were told dont work, be sold to New Zealand?
How can the kiwis get the exact same helicopters to work just fine, yet Australian mechanics, engineers etc, not get them to work. Is it because they eat more lamb or something?
Seriously I do realise that the Kiwi Seasprites will be set up with a lower performance missile (maverick vs penguin from memory), and maybe some other changes as well. Just seems odd that the exact same aircraft that we were told would not work and were not safe to fly, are now to be sold the NZ navy where they seem to go just fine. Are the Kiwis just a fraction less concerned about performance and super high safety standards, such as triple redundant flight computers. Is it the colder/thicker air or is it more rainfall washing off the salt. I know there is a logical and rational reason behind it all, I just dont know what it is
Did Australia try to over-complicate things, try and push a two man crew where a three person crew would have been simpler? Was the saving of one crew person so that they could make the ship that little bit smaller?
How can those Seasprite helicopters that we were told dont work, be sold to New Zealand?
How can the kiwis get the exact same helicopters to work just fine, yet Australian mechanics, engineers etc, not get them to work. Is it because they eat more lamb or something?
Seriously I do realise that the Kiwi Seasprites will be set up with a lower performance missile (maverick vs penguin from memory), and maybe some other changes as well. Just seems odd that the exact same aircraft that we were told would not work and were not safe to fly, are now to be sold the NZ navy where they seem to go just fine. Are the Kiwis just a fraction less concerned about performance and super high safety standards, such as triple redundant flight computers. Is it the colder/thicker air or is it more rainfall washing off the salt. I know there is a logical and rational reason behind it all, I just dont know what it is
Did Australia try to over-complicate things, try and push a two man crew where a three person crew would have been simpler? Was the saving of one crew person so that they could make the ship that little bit smaller?
Sorry to make your day worse, but the Kiwis bought our Penguin missiles as well, so no they don't have a 'lower performance missile...'
![]()
We tried to save money by cutting a crew member and automating enough functions so as not to make the type tactically useless, before moving the certification goal posts and making everything that much harder to achieve. As I understand it NZ kept the good bits and dumped the not so good stuff, while putting the third crew member back on board, a simple, effective solution that we could have done years earlier.
Interestingly the Romeos we bought to replace the SH-60B and S-2G have a three man crew as well. Its pretty standard in Australia to stretch too far, scare those in charge when it doesn't work first up and then run scared and flush the entire effort down the toilet once all the hard work has been done to make it all work and we are positioned to do better on a new project, buying MOTS instead.
please lord, shoot me now....
DCNS has brought the Barracuda program under control after earlier running into problems of lateness and cost overrun, the spokesman said. The company has gone through a reorganization, including appointing a new Barracuda program director last October. A first delivery of the Barracuda is still expected to be in 2017 but some six months later than previously scheduled.