knightrider4
Active Member
Defmin did state that much data sharing had been achieved with the Japanese but my thoughts are that if Soryu is chosen that virtually wipes out any major construction in Aust. and leaves us with integration only. HDW would be more amenable to onshore build. I understand the vapour issue but do they revert to 212 and do it on the cheap? Have they learned anything from Collins? FIIK!
I get a really bad feeling about the 216 clean sheet design. The figures quoted for range performance is based on what exactly. There is a lot of money on offer here and companies will say pretty much anything to get that contract. As for technology I would go with Lithium Ion batteries over Sterling AIP any day of the week. The Europeans have a habit of talking big and failing to deliver. Look at the dramas the Hellenic Navy has had. The 216 is essentially a clean sheet design much more to submarine building than stretching the hull as we should know.