Crusader2000 said:
I've been looking for more information on JMSDF forthcoming 16DDH Class. (i.e. Helicopter Destroyers) Do you know of any web-sites?
Ships of the World: Is an excellent naval reference (only in japanese lang though) - but very expensive. It's fundamentally for Professionals
The largest destroyer ship
The fiscal 2004 defence budget will also give the JSDF (the Japanese Maritime Defence Force, to be more precise) the largest destroyer Japan has ever had since the disappearance of its Imperial Navy.
Projected to be built this year is a 13,500-ton helicopter destroyer (DDH) code-named 16DDH (16 as in the Heisei year), with another planned from next year. The 16DDH in JSDF classification is by no means an aircraft carrier. Its characteristic shape, however, is nothing but.
It is almost as large as the Japanese Imperial Navy's Tone class heavy cruisers. It also matches in size such active aircraft carriers as Italy's MM Giuseppe Garibaldi (10,100 tons) and Spain's Principe de Asturia (17,188 tons).
Its modern aegis capacity with phased array radars, plus its advanced information link connecting both the Cabinet situation room and other weapon systems, also give it what the JSDF thinks will be the crucial node for the BMC3 network. This could be the flagship for the entire JMDF fleet.
JSDF maintains it carries only four helicopters, but in practice, it can carry as many as ten. Not only that, it is not entirely impossible for it to be refurbished to carry Vertical, Short Take-off and Landing (V/STOL) aircraft such as the UK's Harrier and F-36B.
basic info:
The 13,500-ton DDH destroyer will use two propulsion trains, each consisting of two LM2500s in a COmbined Gas turbine And Gas turbine configuration (COGAG), driving a propeller through a gearbox. The engines will each provide 25,000 shaft horsepower.
GE supplied the LM2500 gas turbine kits (assembled by IHI at its Mizuho Plant) April 16 and 17 from 9:00 a.m. to 5:00 p.m. Saturday and Sunday, April 23 and 24 and Kure plants 2005 in Japan. The gas turbine marine modules will be delivered for installation aboard the first destroyer in the second quarter 2007. The 16DDH will be commissioned in the first quarter 2009.
Weapons proposed to date
Mk41VLS / ESSM
CIWS
12.7mm
There are some US military publications that have also done articles - but I haven't seen these in the public domain