There is a 24 hour delay of the Integrated Starship Test Flight 2 launch due to a grid fin actuator on the Super Heavy Booster requiring replacement. Ship 25 needs to be destacked and the hot separation ring removed to enable technicians to replace the actuator. The grid fins are control surfaces used during the return flight through the atmosphere.
The launch window is now from
0700 - 0720 central time (1300 - 1320 UTC / GMT 18 NOV 23). This is a very short launch window.
Update on the launch license. This
updated licence grants authorisation for:
4. Authorization: In accordance with the representations in the Space Exploration Technologies, Corp. application as of the date of this license, and any amendments to the license application or waivers approved by the FAA, in writing, Space Exploration Technologies, Corp. is authorized to conduct:
a. Pre-flight ground operations
i. Using the StarshipͲSuper Heavy vehicle.
ii. At SpaceX Boca Chica Launch Complex, Boca Chica, Texas.
b. Flights:
i. Using the StarshipͲSuper Heavy vehicle.
ii. From SpaceX Boca Chica Launch Complex, Boca Chica, Texas.
iii. To Gulf of Mexico and Pacific Ocean locations specified in its application.
iv. For the Orbital Flight Test 2 mission only, unless this license is modified to remove this term.
License No. VOL 23Ͳ129 Rev. 1 Order AͲ1
So, I was incorrect in my most recent post that this license was for multiple launches.