Have a re-read of the Def Mins press release. The project has been brought forward to the mid 2020s.So SEA 1905 Phase 1 seems to moving forward.
Further details will be very interesting.
Particularly the time table to build these upto 8 vessels.
Are they to commence construction after the Arafura build in the late 2020's???
If so that would seem to me a bit late.
If not, is their capacity to keep the Arafura build time table and start construction of Phase 1905 vessels for their delivery to the RAN this decade.
The premise that we need to double our MCM force seems to imply a need!!!.
Yes I appreciate these replacements will also be for our survey fleet but I assume they will be multipurpose MCM / Survey ships hence "the double in size "tag.
Regards S
The construction of the Arafura class OPVs runs through to about 2030, these new ships will therefore be built concurrently for a number of years.
If the current consortium building the Arafura class also wins this project, there is more than enough room in the very large Civmec build/assembly hall.
Having enough skilled manpower will probably be the biggest hurdle with the large number of projects that will be built at Henderson in the coming years.