For example the C2 which weighs almost twice the weight of the P8 can take off with 26 tonne freight in 900mtrs.
Correction, It can land in 900 meters with a 26 ton cargo payload.

The take off distance for a full payload of 37.6 ton is 2,300 meters.
 

Rob c

The Bunker Group
Verified Defense Pro
I wonder if the discussion of whether or not the P8 can operate out of WP (Whenuapai) is side tracking the conversation. To me this is less of an issue than what the platform offers NZDF, so IMHO the main issues are what are the differences in capability between the P8 and P1? Each platform has its individual strengths and weaknesses and whether or not a platform may or may not have problems getting in and out of WP is not a deal breaker. There can be work arounds. For example, currently the P3s have to fly to OH (Ohakea) to be "bombed up" (loaded with Mk82 500lb GP bombs) before returning to Auckland to drop them at the Kaipara range. I am unsure of the reasoning for this but can guess that OSH and NIMBYism is probably to the fore. It is not writ large in stone nor an Act of Parliament that 5 Sqn have to be based at WP. So relocating 5 Sqn is another option.
Just a thought, do they have the facilities for handling bombs at WP when I was there in the late 60's that was all located at Hobsonville. In regard to the relocation of 5 Sqn, very possible and as I said before not necessarily to OH as this would involve an extra 40min transit each way to their main operating area, Treasury wont like that.
 

Rob c

The Bunker Group
Verified Defense Pro
Correction, It can land in 900 meters with a 26 ton cargo payload.

The take off distance for a full payload of 37.6 ton is 2,300 meters.
I Stand corrected, but that is still about 500 meters less than the P8. Used a bad example but point was that you cannot compare different weights of different aircraft types to gauge their runway performance.
 

Rob c

The Bunker Group
Verified Defense Pro
.

Rob & Vonoobie, apologies for being the formatting police, but can you both please check your BB coding and preview your posts before posting when you are replying to posts. Would be greatly appreciated. [/QUOTE]

sorry to be ignorant ( getting to old for some terms) but what is BB coding?
 

ngatimozart

Super Moderator
Staff member
Verified Defense Pro
The weight factor in regard to the runway requirements of the P8/P1 has little to do with their runway requirements it is about their wing loading and configuration of their slats,flaps and engine power For example the C2 which weighs almost twice the weight of the P8 can take off with 26 tonne freight in 900mtrs. If the P8 used Mangere for long range work I think all options regarding types are still open
It is also unlikely that a smaller type would satisfy the RFI.

Rob & Vonoobie, apologies for being the formatting police, but can you both please check your BB coding and preview your posts before posting when you are replying to posts. Would be greatly appreciated.
The P8 has the wings from the B737-900, the fuselage of the B737-800 and two CFM56-7B engines. That should help. The MTOW is 189,200 lbs, empty weight is 77,200 lbs, engine thrust is 27,000 pounds / engine. This is the data that you will be looking for. Boeing 737 Detailed Technical Data
B757 data http://www.boeing.com/resources/boe..._bca/startup/pdf/historical/757_passenger.pdf
 

ngatimozart

Super Moderator
Staff member
Verified Defense Pro
.

Rob & Vonoobie, apologies for being the formatting police, but can you both please check your BB coding and preview your posts before posting when you are replying to posts. Would be greatly appreciated.

sorry to be ignorant ( getting to old for some terms) but what is BB coding?
No probs and you are not ignorant. It's just something new to learn and show the grandkids (in my case) that granddad is up with the play :rotfl It's the formatting coding for the posts. This explains it and how you use it.
http://www.defencetalk.com/forums/misc.php?do=bbcode
 

Rob c

The Bunker Group
Verified Defense Pro
The P8 has the wings from the B737-900, the fuselage of the B737-800 and two CFM56-7B engines. That should help. The MTOW is 189,200 lbs, empty weight is 77,200 lbs, engine thrust is 27,000 pounds / engine. This is the data that you will be looking for. Boeing 737 Detailed Technical Data
B757 data http://www.boeing.com/resources/boe..._bca/startup/pdf/historical/757_passenger.pdf
And just to add to the confusion, ours were rebuilt to 757-200M standard for which there was only one new build. When talking about runway requirements one must also take into account that the published figures only apply on a standard day, and that these figures change with temp,pressure and wind speed etc, at best any published figures are only a rough guide. in real time the are calculated for every flight.
 

ngatimozart

Super Moderator
Staff member
Verified Defense Pro
Thanks I can now show my Great grand kids, the grand kids are old enough to figure it out for them selves.
No probs at all. It is sometimes difficult to keep up with the grandkids :D Mind you I regard it as my mission to corrupt them as in teaching them some "bad" habits - keeps their parents on their toes :rotfl
 

Rob c

The Bunker Group
Verified Defense Pro
No probs at all. It is sometimes difficult to keep up with the grandkids :D Mind you I regard it as my mission to corrupt them as in teaching them some "bad" habits - keeps their parents on their toes :rotfl
Totally off forum subject, but what else are grandparents for?Then when you have had enough you just go, "Mum/Dad your problem".
 
Last edited:

RegR

Well-Known Member
I think the TEU capacity in the Antarctic context is just a bonus, the main feature is the delivery of fuel and as a trade off for us delivering the fuel and the yanks deliver the bulk.
Yes agree as all our TEUs come down on the same ship as the americans every year so the End ones would/could just be extras if and when needed. This is why our NZDF offload teams play a major role for this particular part of the op for both bases.

Always good to have options though.
 

RegR

Well-Known Member
For example, currently the P3s have to fly to OH (Ohakea) to be "bombed up" (loaded with Mk82 500lb GP bombs) before returning to Auckland to drop them at the Kaipara range. I am unsure of the reasoning for this but can guess that OSH and NIMBYism is probably to the fore. It is not writ large in stone nor an Act of Parliament that 5 Sqn have to be based at WP. So relocating 5 Sqn is another option.
Yes has to do with bombing up in built up areas as has to be done in a relatively people free corner of the base which is hard to find in a major city. I guess a bomb going off plus a fuel loaded P3 will make for an impressive crater so the least distractions, interference and collateral damage the better. They set up a point right down the end of the runway away from base in a makeshift set up CW fire overwatch, ironically where they parked a rather dodgy looking russian freighter one year to refuel as well wherein the crew tried paying in cash (which is not done for obvious reasons), failing that probably vodka haha.

I see in the capital rebuild a purpose built arming point is to be built, good news as currently I think they just put up a 14x14 when required and work in the open. Also AF "bombs" are stored in the Waiouru ammo dump.
 

recce.k1

Well-Known Member
The possibility of a light medium transport coming out of the current RFI would be low, however I it could be a possibility as a twin engine trainer replacement as I have heard some dissatisfaction with the current setup and its lack of flexibility. Time will tell and as time passes the likely hood of changes to what was laid down in the DWP increases. You only have to look at what happened and what did not happen in DWP 2010 to figure that out.
Interesting timing, the five-year B200 lease contract with Hawker Pacific should be expiring at the end of 2017/early 2018.

Could be some interesting options depending on capability funding levels (eg the B350/ER types or what about a couple of C295 sized-types + a couple of Pilatus PC-24 type long range jets as per Mr C's recent suggestion)?

The latter would cover MEPT training for a variety of (future) platforms, HADR first response options to the Pacific, light-medium lift and even regional VIP (better still put the media on the 2nd jet and keep them to themselves - that'll make the pollies happy when on MFAT type tours ... they're bound to sign it off) :D
 

Gibbo

Well-Known Member
Interesting timing, the five-year B200 lease contract with Hawker Pacific should be expiring at the end of 2017/early 2018.

Could be some interesting options depending on capability funding levels (eg the B350/ER types or what about a couple of C295 sized-types + a couple of Pilatus PC-24 type long range jets as per Mr C's recent suggestion)?

The latter would cover MEPT training for a variety of (future) platforms, HADR first response options to the Pacific, light-medium lift and even regional VIP (better still put the media on the 2nd jet and keep them to themselves - that'll make the pollies happy when on MFAT type tours ... they're bound to sign it off) :D
RNZAF has stated they are planning to bring AWO training back from Aussie (where they currently share time on RAAF B350) within 2-3 years, although seen no detail.

It is logical to assume the B200, or it's replacement (ie: 42 sqn) will pick up the AWO task, to add to MEPT & light transport. As to what will replace B200 (or if contract gets extended) is anyone's guess.
 

ngatimozart

Super Moderator
Staff member
Verified Defense Pro
Interesting timing, the five-year B200 lease contract with Hawker Pacific should be expiring at the end of 2017/early 2018.

Could be some interesting options depending on capability funding levels (eg the B350/ER types or what about a couple of C295 sized-types + a couple of Pilatus PC-24 type long range jets as per Mr C's recent suggestion)?

The latter would cover MEPT training for a variety of (future) platforms, HADR first response options to the Pacific, light-medium lift and even regional VIP (better still put the media on the 2nd jet and keep them to themselves - that'll make the pollies happy when on MFAT type tours ... they're bound to sign it off) :D
Mr C's idea is that the PC24 would replace the King Airs and fitted with a basic maritime surveillance radar with AIS capability, so that they could undertake EEZ surveillance as well. If the RNZAF went say P8, C2, KC46 / B737-800 & KC390 and if the PC24 was procured, the only turboprop in the RNZAF inventory would be the T6C Texan II trainer. If that was the case, MEPT could be done just as well by the PC24 as the King Air or any other twin turbine type.

I have to admit that, on the face of it, a P8A, C2, KC46, KC390 & PC24 fleet would be quite good.
 

RegR

Well-Known Member
Interesting timing, the five-year B200 lease contract with Hawker Pacific should be expiring at the end of 2017/early 2018.

Could be some interesting options depending on capability funding levels (eg the B350/ER types or what about a couple of C295 sized-types + a couple of Pilatus PC-24 type long range jets as per Mr C's recent suggestion)?

The latter would cover MEPT training for a variety of (future) platforms, HADR first response options to the Pacific, light-medium lift and even regional VIP (better still put the media on the 2nd jet and keep them to themselves - that'll make the pollies happy when on MFAT type tours ... they're bound to sign it off) :D
Or they could just take the easy option, renew the lease and carry on as per. Common sense would be to use the oppourtunity to come up with a more multi-role approach but that is sometimes lacking within our govt.
 

ngatimozart

Super Moderator
Staff member
Verified Defense Pro
With all this talk about capability I forgot had this definition of capability as used by Ministry of Defence / NZDF:
Military capability is the power, capacity or ability to achieve a desired operational effect in a selected environment, and to sustain that effect for a designated period. Characteristics of military capability determine its quality as well as its ability to perform and are the combination of preparedness and the components of capability.

The components of capability are the quantitative dimension and include: Personnel, Research and Development, Infrastructure and Organisations, Concept of Operations, Information and Technology, Equipment and Logistics. These components also need to be compatible and interoperable with existing capability including those of coalition partners. When combined these components contribute to the capabilities 'preparedness' to deliver a military effect. Preparedness is a qualitative dimension and includes Readiness, Combat Viability, Deployability, and Sustainability
Background on Military Capability and the Evolution of the Defence Capability Management Framework - Ministry of Defence background paper for Foreign Affairs, Defence, and Trade Select Committee.
Further into the paper it states that NZDF capability is not a linear development, instead taking a circular approach. This is because they have found that the narrow focus on the acquisition can lead to neglect of the full range of capability options; that the capability being acquired delivers vfm and performs as it is supposed to; and that a full analysis of capability options should be performed to solve the problems that the capability acquisition is intended to resolve.

It is worth a read and I note that a new version was being formulated when this paper was written (2008). I also note that the Capability Management Framework that it follows has been based on the Canadian Defence Force CMF. (shudder) :)
 

MrConservative

Super Moderator
Staff member
There are a couple of things to consider with respect to Whenuapei operations over the medium term.

1. The urgent demand for houses to be build on its site will increase until the demand pressure gets so much it will go the way of Hobsonville. It will be a subdivision.

2. The RNZAF presence in Auckland will be transferred to a 'sub base' facility at AIA which if plans head for fruition will have its 2150m second runway around 2025-2030. Maybe only 6 Sqd and 5 Sqd could remain with 40 Sqd going to OH or even both 40 & 5 Sqd going to an enlarged OH base.

The WP base is worth a considerable amount as it is on high value land if zone residential. It would fund a new smaller joint use facility at AIA and probably pay for further growth at OH.

I would not be surprised if this is at least raised or even happens.
 

ngatimozart

Super Moderator
Staff member
Verified Defense Pro
I would say this is a very likely outcome, and while the govt ofd the day who does this should also look at selling Devonport Naval Base at the same time.
They'd even get more per sq metre for Devenport NB than WP. Both are prime real estate, but DNB more so.
 