A minor update, the Be-200 contract is for 2 Be-200ChS (fire-fighting variant) and 4 Be-200PS (SAR). However the only physical difference is the absence of the container for water in the PS variant. Deliveries are to conclude in 2015.
alexeyvvo -
It'll be interesting to see if an ASW variant is developed. The current Il-38 upgrade doesn't remove the need for a new aircraft. There's also the question of long range maritime patrol aircraft. Current Tu-142s are not only insufficient for that, but they're also not enough of them.
alexeyvvo -
It'll be interesting to see if an ASW variant is developed. The current Il-38 upgrade doesn't remove the need for a new aircraft. There's also the question of long range maritime patrol aircraft. Current Tu-142s are not only insufficient for that, but they're also not enough of them.