WASHINGTON, October 20, 2010 – The Defense Security Cooperation Agency notified Congress today of a possible Foreign Military Sale to the Government of Saudi Arabia of:
84 F-15SA Aircraft
170 APG-63(v)3 Active Electronically Scanned Array Radar (AESA) radar sets
193 F-110-GE-129 Improved Performance Engines
100 M61 Vulcan Cannons
100 Link-16 Multifunctional Information Distribution System/Low Volume Terminal (MIDS/LVT) and spares
193 LANTIRN Navigation Pods (3rd Generation-Tiger Eye)
338 Joint Helmet Mounted Cueing Systems (JHMCS)
462 AN/AVS-9 Night Vision Goggles (NVGS)
300 AIM-9X SIDEWINDER Missiles
25 Captive Air Training Missiles (CATM-9X)
25 Special Air Training Missiles (NATM-9X)
500 AIM-120C/7 Advanced Medium Range Air-to-Air Missiles (AMRAAM)
25 AIM-120 CATMs
1,000 Dual Mode Laser/Global Positioning System (GPS) Guided Munitions (500 lb)
1,000 Dual Mode Laser/GPS Guided Munitions (2000 lb)
1,100 GBU-24 PAVEWAY III Laser Guided Bombs (2000 lb)
1,000 GBU-31B V3 Joint Direct Attack Munitions (JDAM) (2000 lb)
1,300 CBU-105D/B Sensor Fuzed Weapons (SFW)/Wind Corrected Munitions Dispenser (WCMD)
50 CBU-105 Inert
1,000 MK-82 500lb General Purpose Bombs
6,000 MK-82 500lb Inert Training Bombs
2,000 MK-84 2000lb General Purpose Bombs
2,000 MK-84 2000lb Inert Training Bombs
200,000 20mm Cartridges
400,000 20mm Target Practice Cartridges
400 AGM-84 Block II HARPOON Missiles
600 AGM-88B HARM Missiles
169 Digital Electronic Warfare Systems (DEWS)
158 AN/AAQ-33 Sniper Targeting Systems
169 AN/AAS-42 Infrared Search and Track (IRST) Systems
10 DB-110 Reconnaissance Pods
462 Joint Helmet Mounted Cueing System Helmets
40 Remotely Operated Video Enhanced Receivers (ROVER)
80 Air Combat Maneuvering Instrumentation Pods
Also included are the upgrade of the existing Royal Saudi Air Force (RSAF) fleet of seventy (70) F-15S multi-role fighters to the F-15SA configuration, the provision for CONUS-based fighter training operations for a twelve (12) F-15SA contingent, construction, refurbishments, and infrastructure improvements of several support facilities for the F-15SA in-Kingdom and/or CONUS operations, RR-188 Chaff, MJU-7/10 Flares, training munitions, Cartridge Actuated Devices/Propellant Actuated Devices, communication security, site surveys, trainers, simulators, publications and technical documentation, personnel training and training equipment, U.S. government and contractor engineering, technical, and logistical support services, and other related elements of logistical and program support.
The estimated cost is $29.432 billion.
http://www.dsca.mil/PressReleases/36-b/2010/Saudi_Arabia_10-43.pdf
A couple of big points:
1. All existing F-15S fighters are to be upgraded to F-15SA.
2. IRST Included
3. Harm and Harpoons included