Press reports over the weekend and quotes from Cameron leads one to think that at least one carrier will be built and not placed in reserve (as advocated by Jock Stirrup, number one RAF supporter). The second PW carrier definitely cancelled. Industry consolation prize (to avoid penalty clauses) immediate contracts awarded for smaller vessels (one assumes 26 & C3) to begin construction once the yards finish QE work. Decision on actual number of F35B's to be determined later.
Best case scenario in my opinion: 1 x QE built as planned. Batch 1 T26 ordered (six off), Batch 1 C3 ordered (six off). Then (fingers crossed) a smaller commando carrier is ordered capable of carrying limited numbers of F35B (6-8) to cover QE downtime, similar to Spanish or Italian current offerings minus well deck subject to improvements in the economy. Second batch of T26 & C3 to follow-on. C2 downgraded to C3 status - general purpose MCM/OPV capable of anti--piracy and global littoral tasks against low-level threats.
At least the RN would end up with limited numbers of cutting edge Destroyers, Frigates, MCM/OPV's and SSN's capable of protecting the ARG. Older T23's fitted with CAMM and kept on for policing / piracy work.
Also if one carrier is built we may see the retention of both Albions and at least two Bays.
I also reckon MR4 will be cancelled and replaced by marinised Predator/Reaper to compliment the planned ten already on order for the RAF based out of Waddington and Scotland (to provide Faslane coverage). Huge cost savings (man-power & training) using an existing platform fitted with a surveillance system suited to a maritime environment. Not a patch on MR4, but fit for role based on current threat levels (post Cold War). May even be able to fly from QE?
Best case scenario in my opinion: 1 x QE built as planned. Batch 1 T26 ordered (six off), Batch 1 C3 ordered (six off). Then (fingers crossed) a smaller commando carrier is ordered capable of carrying limited numbers of F35B (6-8) to cover QE downtime, similar to Spanish or Italian current offerings minus well deck subject to improvements in the economy. Second batch of T26 & C3 to follow-on. C2 downgraded to C3 status - general purpose MCM/OPV capable of anti--piracy and global littoral tasks against low-level threats.
At least the RN would end up with limited numbers of cutting edge Destroyers, Frigates, MCM/OPV's and SSN's capable of protecting the ARG. Older T23's fitted with CAMM and kept on for policing / piracy work.
Also if one carrier is built we may see the retention of both Albions and at least two Bays.
I also reckon MR4 will be cancelled and replaced by marinised Predator/Reaper to compliment the planned ten already on order for the RAF based out of Waddington and Scotland (to provide Faslane coverage). Huge cost savings (man-power & training) using an existing platform fitted with a surveillance system suited to a maritime environment. Not a patch on MR4, but fit for role based on current threat levels (post Cold War). May even be able to fly from QE?
Last edited: