The point is the jci, not the pda (1988), the jci will be able to do that, and and pda also has:Different systems and most likely on a completely different scale. The ADF has more money to spend then the Spanish Forces, and they will spend it. Speaking with no knowledge, I wouldn't be surprised if the only ships at sea comparable to Canberra's Comm's fitout once they are built will be the US Task Force command ships (Carriers, LHD's and Command ships) along with the UK Albion class and QE class.
When was the last time PdA served as Flagship for a Combined Task Force including USN , MN and RN in an operational (non-exercise) capacity.
"Comunicaciones UHF SATCOM, SECOMSAT, INMARSAT, ICCS-4, LINK-11, LINK-14, radio HF, UHF, VHF."
and now the pda will enter in the yard for the upgrade and the 2 half life cycle, and it will get the same capacities as the jci in many things, so the pda will be able to do it if it cant do it now that i dont know. As other example the Castilla ship that is a galicia type with command and control, is a ship given in the 2000 and can do that (it is a high disponibility headquarter for the nato).
Just i hope the jci doest retard much more with the problems of the engine (they have put a new part or unit and want to finish the trials of all engines by april, i read these engines are proved and similars used in other ships) and the forward pod (similar problem as in the french mistral, that they had to change it).
Cheers.
Last edited: