Tranche 1 (divided into batch 1 & 2):
Batch 1 (Block 1):
Block 1 2003:
- Phase 3 FCS
- EJ200 MK101 EIS
- No refueling probe and gun
- PSP1 software for initial air combat training
- no DASS, IFF, PIRATE, MIDS and some other equipment
- stores 1 x centre line tank, 2 AIM-9L or ASRAAM and 4 x AIM-120B
Block 1B/C (through R1 upgrade from april/may 2005):
- Addition of the refueling probe and gun
- changes to the electrical systems
- software update
Batch 2 (blocks 2, 2B & 5):
Block 2 2004/2005:
- EJ200 MK101FOC
- Phase 3 FCS with DRF and ALSR
- Gun & refueling probe from start
- initial autopilot and DVI
- enhanced AA modes for Captor-C
- DASS with MAWS, ESM & ECM
- MIDS
- initial sensor fusion
- DME-P, GPWS & MLS
- no seperate TACAN (now incorporated by the MIDS)
- stores added: IRIS-T (analoge interface)
Block 2B 2006:
- Phase 4 FCS with AMLS (full carefree handling for AA)
- PSP3 software
- Ariel TRD
- imrpoved sensor fusion
- stores added: AIM-120C-5+ability to use up to 3 x tanks, 4 x SRAAM, 6 x MRAAM
Block 5 2007:
- Phase 5 FCS full performance envelope & AG munitions handling
- PSP4 software
- Full autopilot and DVI
- improved GPS
- Captor-C with initial AG modes
- Full DASS including LWR, automated chaff/flare dispenser and Sky Buzzer TRD (Germany only)
- Initial PIRATE
- full sensor fusion
- weapons: gun for AG, PAveway II and GBU-10/16
Austere Package (RAF Typhoon block 5 only):
- Enhanced Paveway II and Litening III (not fully capable right now)
Notes:
- HEA is supported by PSP4 software and will be delivered in 2009
- PIRATE will receive full functionality with software update
- MAWS currently inactive (hardware exists however), will be "activated" via software update
- All older tranche 1 aircraft will be brought to block 5 standard via the R2 upgrade
Tranche 2 (batches 3, 4 & 5 according original plans):
Batch 3 block 8 2008:
- strengthed airframe
- new engine controls (DECMU)
- new mission computers
- Captor-D (new components including PowerPC processor)
- New DASS/Praetorian computers and ESM/ECM antennas
- PSP4 software is initially used
- No austere package for RAF block 8 aircraft
batch 4 block 8B ~2010:
- Final software revision SRP 4.3
block 9 (Phase 1 Enhancments) 2011-2012:
- New software based on RTOS
- improved MMI including display formats for AG weapons...
- Ability to attack AA targets, while continueing AG run
- new radios
- Improved MIDS (increased transfer rates; improved communication with ground units)
- imrpoved DASS (new ESM/ECM, maybe improved TRD)
- Captor-D additional AG modes
- new GPS (probably DGPS)
- IFF mode 5 likely
- unspecified external changes (maybe Apex strakes or already CFTs)
- weapons: full Litening II/III, IRIS-T (digital), EGBU-16 and Paveway IV
Tranche 2 notes:
Tranche 2 was originally supposed to consist of the three batches 3, 4 and 5 in which aircraft of the standards block 8, 10 and 15 should have been produced with the latter 2 featuring the EOC 1 & 2. EOC 1 & 2 were eventually replaced by P1E & P2E, but just P1E has been contracted (march 30th 2007) and P2E has been abondoned in favor for increamental upgrades similar to the RAFs austere package for block 5 aircraft.
There will be 3 different blocks as part of tranche 2 8, 8B and 9.
Tranche 3:
Tranche 3 was originally supposed to consist of the batches 6 & 7 with aircraft being produced in the so called block 20 & 25 configurations. As there were changes to T2 designations it might be that T3 aircraft will be designated differently. Capabilities has not been specified, but a number of options exists.
These options include:
- Captor-E AESA (with mechanical sweeping options in addition)
- stronger engines (not neccessarily designated EJ230 or EJ270)
- 3-D TVC (a new nozzle based on the current one is studied at the moment, though no requirement exists within the customers)