Here's a neat video showing how the two yard layout is going to work
https://www.youtube.com/watch?v=KP0SmUA7mEc
https://www.youtube.com/watch?v=KP0SmUA7mEc
Here's a neat video showing how the two yard layout is going to work
https://www.youtube.com/watch?v=KP0SmUA7mEc
This is a genuine question and not an opinion masquerading as a question!
Is the decision to preserve both yards being done because that is the most cost efficient way to build warships for the Navy or is it a case of the defence budget being used to support jobs to avoid politically damaging headlines about a yard closure and job losses in Scotland?
Afternoon,
I have read this thread for a number of weeks, becoming acquainted with the tone and the subjects that are discussed, as well as learning a great deal. I thought, with it being such an important year for defence, I'd take the plunge to post...
There is clearly an opportunity for the RN to reduce the strain on its valuable escort resources, by introducing the x3 OPVs in addition to the current Rivers, whilst continuing to maintain a presence in areas that serve British interests.
Given, that the vessels are being built due to the terms of agreement with BAE in regards to the provision of shipbuilding in the UK, the question is, can we absorb the ships running costs into the budget?
There armament* is suitable for the tasks that would be expected of them and not even the treasury could mistake them for 'front line' vessels! They ought to be lean manned and there is a precedent for them to be forward based (hms clyde, minesweeper in the gulf etc).
I wonder....has there ever been consideration, given the areas they would most likely patrol, (N Atlantic patrol, Gibraltar) namely 'British overseas territories' that the territories themselves could help to fun some/if to the running costs of the ships?
I understand, that Gibraltar has expressed that it would contribute to its defence given its geopolitical location. Then there are the likes of Bermuda, the Cayman Islands that stand out, in terms of population and relative wealth (tourism, gaming, banking etc). As well as the Turks and Caicos islands, the Falklands and to a much lesser extent Montserrat, the Ascension islands etc.
*On a side note, I read previously about the limitations of having no hangar facilities. Has there not in the past, been semi permanent hangers, optic hangers(?) installed on ships?
Here's a neat video showing how the two yard layout is going to work
https://www.youtube.com/watch?v=KP0SmUA7mEc
It doesn't appear to make as much sence as the single site option.
https://www.youtube.com/watch?v=nA12hn48eZI
There armament* is suitable for the tasks that would be expected of them and not even the treasury could mistake them for 'front line' vessels! They ought to be lean manned and there is a precedent for them to be forward based (hms clyde, minesweeper in the gulf etc).
*On a side note, I read previously about the limitations of having no hangar facilities. Has there not in the past, been semi permanent hangers, optic hangers(?) installed on ships?
I believe it is essential any vessel assigned to the North Atlantic patrol has an embarked helo (wildcat) to conduct drug busts, surveying damage post hurricanes etc. However, clearly is not essential for the South Atlantic patrol, nor do I think it would be essential if one were posted in Gibraltar, as it could lillypad helos from the frequent escorts that pass through/return to/from the Gulf/East of Suez.
Musings done, typical Sunday.
Thanks, Sellers.
'
Again, not an ideal resolution, and thanks to SYSTEMS ADICT for the link, clearly is quite cumbersome. (Still can not believe we sold HMAS Choules, given the utility and demand on the Bay class)
Many thanks again, Sellers
Suppose it depends on your opinion. The second setup has a greater setup for redundancy, you've got a cluster of manufacturing halls for construction + assembly, then the hull goes downriver for fitting out (which has two docks). The single yard has a number of construction buildings and one covered yard which, presumably, covers all assembly/fitting out.
Considering the second yard is only 2.5km along the Clyde, it's not a long trip down the Clyde and I think they did the same with the Type 45's anyway.
Basically, I don't think it's that big of a deal.
I'm lead to believe the same situation (8 with, 5 without) will continue with the Type 26.
I believe the intention is for it to be FFBNW, it would seem silly (to me as a layman) to alter the design to remove capability* for the last 5.
*in a sense of removing kit, shifting the internal layout or whatever isnt unexpected for a batch build
I stand to be corrected but I believe the last five will NOT be fitted with the equipment needed for the 2087.