Some pertinent questions on whether to go B or C:
What does the RAF want to operate?
Does the RAF want to permanently give up STOVL ops long term?
What is HMS Ocean going to be replaced with? A ski-jump equipped LHD or two, or helicopter lift only?
I think there is only going to be a single JSF fleet. By choosing C, then there will be no LHD or RAF STOVL ops. Is the C that much better that the RN/RAF would want to give these up?
The RAF would prefer C - range and payload are both good. I don't think the RAF doctrinally have any continued interest in STOVL ops and haven't since the cold war died a death and with it, the threat of every airfield getting a bucket of instant sunshine.