I wasn't suggesting the Indians would buy Collins, I doubt they could get them to work if the RAN can't. The whole suggestion on RAN looking at Astutes was based on cutting its losses with then Collins. India already operates 16 boats has 3 SSBNs under construction an I think to SSNs on order from the Russians. My suggestion was to work with the Indian's in either a JV or export Astutes.
I am not to sure about the US support for the Astutes but thought it was about a design contract rather than systems. They may own the IP, however BAe might own that. either way I am not sure the US is keen on unsetting the Indians.
in 1998 the West tried the naughty school boy sactions on India and it backfired, they just moved to buying elsewhere Israel/Russian. The UK/RN needs to forge very close links with India in 50 years this is probably going to be 2-3rd Navy? For the RN this could be a way to kill 2-3 birds with one stone.
I wasn't suggesting anything to do with the Indians buying Collins, it was an example of the degree of US involvement on a foreign sub design as an analogy of why the US may not be happy about the Astute going export. Nothing to do with the Collins except by way of example.
The US assistance with the ASTUTE had nothing to do with the over all design, but related to CadCam failures (new system overwhelmed by the complexity of the ASTUTE design), loss of technical expertise (construction processes) and the change in manufacturing techniques (vertical sub-sections completed first, rotated and welded into a final cigar shape). The weapons systems, sonar array et al are proprietary to the UK, not American buy-ins (with the exception of actual weapons themselves - Tomahawk and Sub-Harpoon). The critical relationship if anything is between BAE Submarine Solutions and Thales for the 2076 stage 4/5 sonar system.
Thanks for the clarification mate.