It seems we have to go through this every year... first of all, sorry about the outage for couple of days.
As a result, we've upgraded to a better server:
Server Processor: Quad Core Xeon 5430 - 2.66GHz (
Harpertown) - 2 x 12MB cache
Second Processor: Quad Core Xeon 5430 - 2.66GHz (
Harpertown) - 2 x 12MB cache
So, all together, over 21Ghz of CPU processing power.
Ram / Memory: 8 GB
Disk System/HD: 4x Raptor 10k RPM HDs
First Hard Drive: 74 GB Raptor 10K
In RAID 05 Configuration:
Second Hard Drive: 150 GB Raptor 10K
Third Hard Drive: 150 GB Raptor 10K
Fourth Hard Drive: 150 GB Raptor 10K
Disk Controller: SATA RAID 5 Disk Controller
Uplink Port: 100 Mbps Public & Private Networks (upgradeable to 1000Mbps)
Price: Don't ask!
I would love to hear your comments and performance of the site over the next few weeks?
Thanks and enjoy!