I've been working my way through the LOSC Tender Doc. They are the most detailed documents I've seen come out of MOD. This is what I've been able to determine so far:
- Project Cost: $NZ275 Million Capital Plan Cost with expected tender range of $NZ165 - $180 million (Tenders outside that range will not be excluded).
- General Comments: Desirable to fit dry dock at DNB but not compulsory. Maximum Draft of 7.2 metres in full load end of life condition. Beam Constraint – Must be able to transit Panama Canal. The position of the RAS station optimised for abeam RAS operations with the RNZN MSC. Greater compliance with Allied Naval Engineering Publication (ANEP 77). Designed for operations upto SS5.
- Availability: 200 Days per year
- Endurance: 42 Days with 120 people: Core Crew: 70, Additional up to 50 (this includes an embarked force). 90 Days spares
- Speed: 4,000 – 6,000 NM @ 14 knots Cruising. There are two distance profiles, both specify 14 knots but at differing ranges. I would think the 6,000nm would be the more appropriate of the two.
- Sensors identified: Helicopter Approach / Littoral Surveillance - Sharp Eye S Band. ESM / IRST and Electrical Optical specified.
- Helicopter Capability: Flight Deck: Hangar - (2x Schiebel S-100 Camcopter have been used for planning purposes only).
Still working through it. I felt there was a greater emphasis on militarisation in some areas (i.e. Damage Control), but that could be just normal commercial practice today on a ship like this.