ADM reports this am that a “possible” strategy for the SSN build will be for Australi to build the front half of the boats and for the US to build the stern section from the reactor aft.
Worth a thought although still speculative.
More details on Australia's intended acquisition of nuclear-powered submarines have come to light this week.
www.australiandefence.com.au
Interesting read, love how they have a pic of an Astute on an article about getting the Virginia's
Initial thought's, very plausible indeed, palming off the back half or so for US construction as the nuclear component is passable I think to the public and easily explained.
The US method of block/segment construction that then get's brought together for consolidation and stitching together has some merit and could offer a quicker path to floating a boat, would think an increase in block construction from a US perspective as opposed to building an entire boat would be very much within their current capability without putting time pressure on their domestic build.
Interesting indeed