Royal Australian Navy Discussions and Updates 2.0

Another video from BAE Systems Australia on their FB site showing the Block 4 hull section being moved to the Blast & Paint chamber. The section appears to be in very good condition with no rust evident - this is much better than what I’ve seen on videos from other shipbuilders overseas.

You may not be able to view this if you don’t have a FB account but I haven’t been able to find the video elsewhere.
It's also available on BAE Aus youtube channel if that helps anyone. They often post there first.
 

Stampede

Well-Known Member
Any guess when the first Barracuda would have been delivered? Wasn’t 2026 the first delivery?
I understand it was to be in the water in late 20s for entry to service in 2030.

A good conversion for ten years time as to whether it was the right or wrong decision back in the day.

Cheers S
 

Joe Black

Active Member
I don't think it was a good move to have cancelled the project altogether, but then again, it could have been a bottomless pit given the French are infamous with project slippages. I would have loved to see an interim buy of sons of Collins (perhaps a slightly enlarged boat with some updated technology taken from the Shortfin Barracuda/and perhaps Saab's A26 class) rather than doing the MLU/LOTE on all 6 existing Collins.
 
Top