Does anyone know what's happening with LAND 400 Phase 3, for 100 Combat Support Vehicles?
This would boost production to 239 assuming the project is still happening.
Likely it would give Lynx the edge due to its modular design and ability to convert vehicle types in a matter of hours.
It would also provide an option for a survivable Lynx APC with an RCS instead of turret, to replace more of the M-113s more affordably, while having the potential to be quickly upgraded later if required.
They are gone. Replaced by Hercules, Breacher and Joint Assault Bridge, under Heavy Armoured Combat Systems - LAND 907 Phase 2 and LAND 8160.
Basis of Provisioning for LAND 400 pH.3 now according to June DTR magazine is 78x direct fire IFV variants and 51x C2 / Joint Fires vehicles. To go wholly to 9 Brigade, School of Armour and Trade Training schools.
Everything else under LAND 400 has been cancelled including armoured mortar, ambulance, armoured logistics, fitter / recovery, surveillance, amphibious vehicles and the MSV complement…