Many European nations are currently in the process of planning out their future replacement of MCM ships, FACs, and/or corvettes and light OPVs.
Nations that have such projects under consideration are almost all nations of the WEU for a "future mine countermeasures concept"; other examples would be Germany for K131, the UK with C3, Italy with its Minervas. Envisioned IOC dates for such projects mostly range around 2020, notably none of these nations as of yet have a design in mind for this. Denmark's Flyvefisken, for example, might also be up around the same time.
With regard to mine countermeasures, most nations involved here do envision a somewhat larger, ocean-capable combatant as a better solution, often coupled with extensive use of drone technology; this replacement project actually is considered a priority item by the EDA.
I'd like this thread to be about what kind of ship could bring the above replacement projects under one common successor - a smaller LCS-like concept, or a broadening of C3, if you want to call it that.
Treat it as a C3 discussion if you want, but keep it a bit more general.
Conceptual type replacement:
- usage as C3, and requisite replacement of austere hulls
- replacement of Tripartite, Einheitshülle Minenabwehr and Lerici I/II
- replacement of Gepard FAC and Minerva corvettes
Conceptual numbers replacement:
- minimum equal tonnage for overall project (current for above: about 67,000 tons)
- minimum half the number of hulls (current for above: about 90 hulls)
(an example would be 48 ships of full load displacement of minimum 1,400 tons, or about 75 1,000-ton ships - like that)
Conceptual role requirements:
- limited blue-sea capability; minimum 14 days endurance; capability to receive RAS
- modular or fixed mine countermeasures systems (austere drone control systems, observation drones, destruction drones, requisite deployment equipment)
- modular or fixed combat systems (sensors/effectors) with a primary ASuW and MIO role
- potential usage in a few other roles (such as ASW picket)
- helicopter deck for medium helo; with or without hangar and further support facilities
- reasonable pricing (gross region for overall project: 5-7 billion Euro)
- low operating costs (affecting crew size and propulsion primarily, obviously)
Anyone game? :unknown
Nations that have such projects under consideration are almost all nations of the WEU for a "future mine countermeasures concept"; other examples would be Germany for K131, the UK with C3, Italy with its Minervas. Envisioned IOC dates for such projects mostly range around 2020, notably none of these nations as of yet have a design in mind for this. Denmark's Flyvefisken, for example, might also be up around the same time.
With regard to mine countermeasures, most nations involved here do envision a somewhat larger, ocean-capable combatant as a better solution, often coupled with extensive use of drone technology; this replacement project actually is considered a priority item by the EDA.
I'd like this thread to be about what kind of ship could bring the above replacement projects under one common successor - a smaller LCS-like concept, or a broadening of C3, if you want to call it that.
Treat it as a C3 discussion if you want, but keep it a bit more general.
Conceptual type replacement:
- usage as C3, and requisite replacement of austere hulls
- replacement of Tripartite, Einheitshülle Minenabwehr and Lerici I/II
- replacement of Gepard FAC and Minerva corvettes
Conceptual numbers replacement:
- minimum equal tonnage for overall project (current for above: about 67,000 tons)
- minimum half the number of hulls (current for above: about 90 hulls)
(an example would be 48 ships of full load displacement of minimum 1,400 tons, or about 75 1,000-ton ships - like that)
Conceptual role requirements:
- limited blue-sea capability; minimum 14 days endurance; capability to receive RAS
- modular or fixed mine countermeasures systems (austere drone control systems, observation drones, destruction drones, requisite deployment equipment)
- modular or fixed combat systems (sensors/effectors) with a primary ASuW and MIO role
- potential usage in a few other roles (such as ASW picket)
- helicopter deck for medium helo; with or without hangar and further support facilities
- reasonable pricing (gross region for overall project: 5-7 billion Euro)
- low operating costs (affecting crew size and propulsion primarily, obviously)
Anyone game? :unknown